Back to your search
Apply Now
Print Report Share View in new tab
15 June 2020
Job ID: RIA-565
LAB ANALYST

Job Description and Responsibilities:

  • Assisting Lab Specialist for hydrocarbon in soil analysis.
  • Collect and process laboratory data.
  • Perform laboratory analysis and research.
  • Provide data interpretation and technical report.

Job Requirements:

  • Diploma degree with minimum GPA 2.75 in chemistry.
  • Minimum 4 years of working experience in laboratory especially petrochemical oil and gas upstream/downstream business.
  • Familiar with ISO-17025 documentation, implementation and accreditation.
  • Good knowledge on laboratory safety and standard.
  • Have excellent computer skills including Microsoft office and basic programming.
  • Excellent in communication and interpersonal skill.
  • Excellent in establish effective relationships with multicultural people in diverse organization.
  • Excellent in demonstrating the highest standard of integrity and ethical conduct, building & maintain trust, respect and support others.
  • Able to communicate verbally and in writing in both Bahasa Indonesia and English.
  • Have willingness to be relocated to all Company operations locations in Indonesia.

At Chevron you’ll join a team with the technology to take on big challenges, the integrity to do it responsibly, and the drive to keep the world moving forward. Are you up for the job?

Apply Now

Job Details:
  • Employment Type:
    Contract
  • Job Functions:
  • Company Industry:
    Energy / Power / Water / Oil & Gas / Waste Management
  • Location:
    Riau, Indonesia
  • Salary:
    Salary negotiable

CHEVRON PACIFIC INDONESIA, PT
PT. Chevron Pacific Indonesia (PT CPI) holds a 100 percent-owned and operated interest in the Rokan PSC, which expires in 2021. Net daily production averaged 122,000 barrels of crude oil and 21 million cubic feet of natural gas in 2017. Duri is the largest producing field in the Rokan PSC. We continue to implement projects designed to sustain production, increase recovery and improve reliability from existing reservoirs. In 2016, we continued infill drilling and workover programs. Duri has been under steam flood since 1985 and is one of the world’s largest steam flood developments. In 2017, net daily production averaged 54,000 barrels of crude oil. Infill drilling and workover programs continued in 2017. Net daily production in 2018 from all producing areas in Indonesia averaged 104,000 barrels of liquids.

Is this your company? Claim it now!