Back to your search
Apply Now
Print Report Share View in new tab
13 February 2020
Job ID: GOR-432
Mandarin Translator

Qualifications:

  • Assignment will be in Gorontalo Utara;
  • Fluent in Mandarin and Bahasa Indonesia, moderate proficiency in English; 
  • Strong organizational skills and the ability to work independently with modest supervision;
  • Strong interpersonal skills, including the ability to work as part of a team and to successfully interact with a variety of personalities;
  • Working familiarity with the MS Office Suite, particularly Word, Excel, and PowerPoint;
  • Associate degree required, Bachelor degree preferred especially from Linguistic;
  • At least 3 - 5 years experience for simultaneous interpreting;
Apply Now

Job Details:
  • Employment Type:
    Contract
  • Company Industry:
    Engineering - Electrical / Electronic / Mechanical
  • Location:
    Bone, Gorontalo, Indonesia
  • Salary:
    Salary negotiable

Benefits:
  • Overtime pay
  • Performance bonus
  • Gratuity
  • Transportation allowance

SEPC
Established in 1953, being the subsidiary company of Power Construction Corporation of China(POWERCORP CHINA), Shanghai Electric Power Construction Co.,Ltd (hereinafter referred to as SEPC) is a large power construction enterprise engaging in the construction of big power station and power transmission & distribution projects, holding the first grade qualification certificate for general contracting electric power construction projects.   SEPC has been developed into a large corporation specializing in civil and architectural works, equipment erection, power unit commissioning, power transmission and distribution, building substations, project consultation, manufacturing and fabrication, logistics and training, etc After determining the strategy for oversea new market, SEPC set up a legal entity in Jakarta, Indonesia named PT. Shanghai Electric Power Construction, which is engaged in electric power generation, civil engineering construction and consulting work relevant to power plant construction. On December 25, 2013, SEPC entered into the EPC contract for Indonesia KIM 2X150MW Coal-Fired Power Plant with PT. MABAR ELEKTRINDO, initialized the agreement in Beijing. As the first EPC project in Indonesia, it will be a stone mile and a good start to build SEPC into an international power engineering corporation.

Is this your company? Claim it now!